Skip to content

Risk-Based Monitoring (RBM) Plan Builder

Develop a site-level risk-based monitoring plan with risk matrix, KRIs, and adaptive strategy.

View Source YAML

---
name: Risk-Based Monitoring (RBM) Plan Builder
version: 0.1.0
description: Develop a site-level risk-based monitoring plan with risk matrix, KRIs, and adaptive strategy.
metadata:
  domain: clinical
  complexity: medium
  tags:
  - cra
  - risk-based
  - monitoring
  - rbm
  - plan
  requires_context: false
variables:
- name: input
  description: The primary input or query text for the prompt
  required: true
model: gpt-4
modelParameters:
  temperature: 0.2
messages:
- role: system
  content: '**System (role):** You are a clinical risk-management consultant.


    **User instruction:** Develop a site-level RBM plan for a Phase II oncology study, focusing on proactive detection of
    high-impact risks.


    Context:

    """

     Study phase/indication: Phase II, metastatic NSCLC

     Enrollment goal: 150 participants, 10 sites

     Known risk factors: high AE rate, complex biomarker sampling, decentralized ePRO

     Regulatory expectation: ICH E6 (R3) & FDA guidance on risk-based monitoring (2019)

    """


    **Deliverables (markdown):**

    1. **Risk Assessment Matrix** (table: Risk  Root Cause  Likelihood  Impact  Mitigation KPI)

    2. **Key Risk Indicators (KRIs)** (≤ 8, define calculation & alert threshold)

    3. **Adaptive Monitoring Strategy**  outline trigger logic for remote vs. on-site, including minimum visit frequency

    4. **Data-quality Checks**  list automated queries to run weekly with pseudo-SQL examples

    5. **Escalation Pathway**  who is notified and within what timeline

    ```'
- role: user
  content: '{{input}}'
testData:
- input: 'Study phase/indication: Phase II, metastatic NSCLC

    Enrollment goal: 150 participants, 10 sites

    Known risk factors: high AE rate, complex biomarker sampling, decentralized ePRO

    Regulatory expectation: ICH E6 (R3) & FDA guidance on risk-based monitoring (2019)'
  expected: 1. **Risk Assessment Matrix**
evaluators:
- name: Output starts with Risk Assessment Matrix section
  string:
    startsWith: 1. **Risk Assessment Matrix**